2025 Building Fees

Flat-rate minimum permit fee is $195.


A: Construction — new buildings, additions, alterations

Description Charging Parameter Fee
Group A: assembly occupancies
New and additions $/ft² $2.46
Alterations/renovations $/ft² $0.75
Group B: detention, care and treatment, and care occupancies
New and additions $/ft² $2.63
Alterations/renovations $/ft² $0.75
Group C: residential occupancies
New and additions — detached, semi-detached, townhouse, and rowhouse $/ft² $1.71
New and additions — multi-unit, apartments, hotels, and other $/ft² $1.56
Alterations/renovations $/ft² $0.75
Accessory dwelling unit $/ft² $0.54
Garage, deck, shed, and sunroom Flat $195
Groups D/E: business, personal services, and mercantile occupancies
New and additions — finished $/ft² $2.31
New and additions — shell $/ft² $1.66
Alterations/renovations $/ft² $0.75
Group F: industrial occupancies
New and additions — finished $/ft² $1.98
New and additions — shell $/ft² $0.64
Alterations/renovations $/ft² $0.75
Miscellaneous: other
Designated structures — retaining walls $/linear ft $12.36
Designated structures — all other Flat $1,089
Farm building, accessory building, greenhouse $/ft² $0.70
Public pool Flat $583
Roof $/ft² $0.22
Shoring and/or building excavation $/linear ft $12.36
Underpinning existing foundation $/linear ft $12.36

 

B: Stand alone and miscellaneous work

Description Charging Parameter Fee
Tents/temporary Flat $303
Demolition — one-family dwelling/building less than 3,000 ft² GFA Flat $303
Demolition — other $/ft² $0.22

 

C: Life safety systems

Description Charging Parameter Fee
Electromagnetic locking device Per item $397
Commercial kitchen exhaust hood, dust collectors, fire alarm, spray booth, sprinkler system, or standpipe and hose system Flat (including four devices) plus $/device greater than four $1,586 plus $425 (greater than four)

 

D: Mechanical

Description Charging Parameter Fee
New/alterations to HVAC standalone — house Flat $303
New/alterations to HVAC standalone — other $/ft² $0.18

 

E: Plumbing

Description Charging Parameter Fee
Site servicing/private water lines $/linear ft $2.89
Plumbing fixtures, including backflow prevention devices and backwater valves $/fixture $18.55

 

F: On-site sewage system

Description Charging Parameter Fee
Construction of a septic system — Class 4 Flat $1,132
Construction of a septic system — other Flat $1,020

 

G: Other fees

Description Charging Parameter Fee
Certified model home service Flat $473
Fast track service (in addition to the regular permit fee payable for the entire project) Flat plus $/hr over four hours $582 plus $147 per hour
Alternative solution application Flat plus $/hr over four hours $568 plus $140 per hour
Change of use permit Flat $303
Transfer of permit Flat $303
Occupancy permit (of unfinished building) Flat $308
Partial permits/staged construction — foundation stage including underground site services Flat plus applicable fee per cent $411 plus 25 per cent of applicable fee
Partial permits/staged construction – superstructure Flat plus applicable fee per cent $411 plus 25 per cent of applicable fee
Partial permits/staged construction - interior finishing Flat plus applicable fee per cent $411 plus 25 per cent of applicable fee
Partial permits/staged construction – completion Flat plus applicable fee per cent $411 plus 25 per cent of applicable fee
Conditional permit Flat $1,369
Amendment to conditional permit agreement Flat $411

 

H: Signs

Description Charging Parameter Fee
Ground signs exceeding 7.5 metres tall $/ft² $1.24
Projecting sign weighing more than 115 kilograms $/ft² $1.24
Projecting sign attached to a parapet $/ft² $1.24

Source: City of Welland By-law 2020-140

By-law under the Building Code Act with respect to construction, demolition, change of use, occupancy, transfer of permits, and inspections.

Passed by Welland City Council on December 9, 2021.

Other approvals

Where applicable, approval from Welland Fire and Emergency Services, Niagara Regional Health Unit or Traffic Services, Ministry of Labour, Niagara Peninsula Conservation Authority, Ministry of Environment, Fire Marshal’s Office, Ministry of Transportation, or any other regulatory agency will be required before the issuance of a building permit. You can consult with staff to coordinate.

Other fees

In addition to the permit application fee, other fees or deposits could be required and may only be determined after a complete review. Other fees or deposits could include:

Important

The building permit will not be processed until a complete application is submitted.

Please allow enough time for the building division to process your building permit application. The time will depend on the workload of the division but must meet the maximum timeframe allowed in the Ontario Building Code.


Contact